Arbor City Hotel
Location – Aldgate, London
Client – McAleer & Rushe
Sector – Hotel
This project involved the construction of a 278-bed hotel, encompassing a new build fit-out from the basement all the way up to the fifth floor. The scope of the SMG works package for this project included the supply and installation of SFS (Steel Frame System), as well as the construction of British Gypsum internal partitions, linings, shaft walls, bulkheads, MF (Metal Framing), grid ceilings and tape and jointing.
One notable aspect of this project was its highly demanding schedule, which required meticulous planning and efficient execution. Despite the tight timeline, our team successfully delivered the project on time, meeting all the specified deadlines and ensuring the completion of all necessary tasks.